Request #19-508
  Open

In accordance with RCW 42.56 et seq., please provide in electronic form copies of the records listed below:

 

  1. Final contract between the Port of Seattle and Clark Construction for the SEA-TAC Airport International Arrivals Facility (the “Project”), including all amendments and change orders (note, however, that we do not request the copies of the technical specifications and/or plans).
  2. All project schedules provided to the Port of Seattle by Clark Construction in connection with the Project.
  3. All notices of delay submitted by Clark Construction to the Port of Seattle in connection with the Project.
  4. All pay applications submitted by Clark Construction to the Port of Seattle in connection with the Project.
  5. All notices of withholding submitted by Clark Construction to the Port of Seattle in connection with the Project.
  6. All notices of withholding payment issued by the Port of Seattle to Clark Construction in connection with the Project.
  7. All meeting minutes relating to the Pedestrian Walkway portion of the Project.
  8. All Communications between KPFF Consulting Engineers and the Port of Seattle in connection with the Project.
  9. All communications with Peer Review Consultant Greg Griffin of David Evans Associates related to the to the Pedestrian Walkway portion of the Project.
  10. All Design Change Notices related to the Pedestrian Walkway portion of the Project.
  11. All Communications between KCE Structural Engineers, PC, Allyn Kilsheimer, P.E., Wiss Janney Elstner Associates (WJE) or Travis Green, either directly or through Clark Construction, on the one hand, and the Port of Seattle, on the other hand, in connection with the Project.
  12. All insurance policies providing coverage for property damage or errors and omissions applicable to this project, including but not limited to Builder's Risk Insurance policies.
  13. Clark Construction project payment bond

 

If the cost of processing this request exceeds $1,000.00 please advise us in advance of proceeding.  We look forward to a response within 5 business days.


Received

October 25, 2019 via web


Departments


Requester

Mike White

Documents

Public

(loading...)

Staff

Point of Contact

Public Disclosure Pier 69

Request Reopened Public
March 30, 2020, 9:17am
Request Closed Public

Request Abandoned

March 27, 2020, 1:13pm
Document(s) Released to Requester   Details Public
_App 5 Billing Verification Locked- IAFLocked.xlsx
_App 5 Labor Only Reconciliation final- IAFLocked.xlsx
_App 6 Billing Verification Locked- IAFLocked.xlsx
_App 7 Billing Verification Locked- IAFLocked.xlsx
_App 8 Billing Verification Locked- IAFLocked.xlsx
_App 9 Billing Verification Locked- IAFLocked.xlsx
_App 10 Billing Verification Locked- IAFLocked.xlsx
_App 13 Billing Verification Locked- IAFLocked.xlsx
_App 14 Billing Verification Locked- IAFLocked.xlsx
_App 16(17) Billing Verification Locked Rev 2 Final- IAFLocked.xlsx
_App 17(18) Billing Verification Locked- IAFLocked.xlsx
_App 18(19) Billing Verification Locked- IAFLocked.xlsx
_App 19 Billing Master Locked new SOV (2)- IAFLocked.xlsx
_App 19 Billing Master Locked new SOV- IAFLocked.xlsx
_App 21 Billing Master Locked new SOV (Recovered)- IAFLocked.xlsx
_07_08_2016 Sea_Tac IAF Salaried Labor Rev 0- goldfinch.xlsx
_07_08_2016 Sea_Tac IAF Salaried Labor Rev 1- goldfinch.xlsx
_16(17) 10_07_2016 Sea_Tac IAF Salaried Labor Pricing Rev 1- goldfinch.xlsx
_19 12_09_2016 Sea_Tac IAF Salaried Labor Pricing Rev 0- goldfinch.xlsx
February 24, 2020, 8:02am
Document(s) Released to Requester   Details Public
Pay Estimate #46.msg
Pay Estimate #47.msg
Pay Estimate 42 - GMP reconcilation .msg
Pay Request 39.msg
Pay Request 44 Odd and Even pages .msg
Pay Request 44 Signed .msg
RE CORRECTED MC-0318087 Pay Estimate 29.msg
RE MC-0318087 Pay Estimate 29.msg
RE MC-0318087 Pay Estimate 31.msg
RE MC-0318087 Pay Estimate 37 - IAF.msg
RE MC-0318087 Pay Estimate 38 IAF.msg
RE MC-0318087 Pay Estimate 40 IAF.msg
RE MC-0318087 Pay Estimate 41 IAF.msg
RE MC-0318087 Pay Estimate 43 IAF.msg
RE Pay App #38 Delays.msg
RE Pay App Delays.msg
Scan from a Xerox Color(2).msg
Scan from a Xerox Color(3).msg
Scan from a Xerox Color.msg
Signed Pay Ap 30(1).msg
Add to june 2018 Pay App.msg
April 2018 Payment Application .msg
CLARK CONSTRUCTION GROUP LLC Pay Estimate #03.msg
CORRECTED MC-0318087 Pay Estimate 29.msg
Elecrtonic Copy of Pay Ap 29.msg
FW CORRECTED MC-0318087 Pay Estimate 29.msg
Fwd Message from KM_C554e.msg
IAF Pay Estimate No. 40 - Signed.msg
Pay Application No. 33--December 2017.msg
January 31, 2020, 7:02am
Document(s) Released to Requester Public
2020_01_21 01 4th Installment.zip
January 21, 2020, 2:09pm
Document(s) Released to Requester Public
2020_01_10 01 2nd Installment.zip
January 10, 2020, 1:33pm
Document(s) Released to Requester Public
8 and 9.zip
11.zip
December 19, 2019, 2:12pm
Request Opened Public
Request received via web
October 25, 2019, 11:37am